Gem County · 83617

Emmett remodeling, tile & flooring.

Licensed Emmett, Idaho remodeling contractor for bathroom and kitchen remodels, tile showers and backsplashes, and hard-surface flooring — luxury vinyl plank, laminate, engineered and solid hardwood — across Gem County.

We make the drive to Emmett for tile, hardwood, and full remodels. Same fixed-price proposals and 1-year warranty as our Boise work — no travel surcharges on standard scopes.

Tile, hardwood, and flooring contractor serving Emmett, Idaho
Neighborhoods we serve in Emmett
Downtown EmmettBlack CanyonSquaw Butte foothillsLetha
Local conditions

Built for Emmett homes & climate.

Emmett housing skews older — 1900s farmhouses, 1960s ranches, and a handful of newer subdivisions. Many homes have original fir floors that refinish beautifully if at least 1/8″ wear layer remains.

Emmett's orchard-valley humidity is more variable than Boise's; we acclimate hardwood on site for 5–7 days before install.

45 minutes from Boise — we schedule Emmett jobs in 2–3 day blocks for efficient crew time.

Top services in Emmett

What Emmett homeowners hire us for most.

Original hardwood refinishing

Sanding, staining, and finishing 1900s–1950s Emmett floors. Most projects come out looking like new flooring at a fraction of the replacement cost.

Farmhouse tile installs

12×24 porcelain in mudrooms, entries, and farm baths — DITRA underlayment over varied subfloor conditions.

Full bath remodels

Stud-out bath remodels with new tile showers, porcelain floors, and updated plumbing. Typical 12–15 day scope.

Recent work in Emmett

A representative Emmett project.

Black Canyon farmhouse: refinished 1,100 sq ft of original Douglas fir to a natural matte finish, then installed a new Kerdi shower and porcelain floor in the upstairs bath. 14 days on site, scheduled in two blocks.

Emmett FAQ

Common questions from Emmett homeowners.

Do you charge a travel fee to Emmett?+

Not for projects 800 sq ft or larger — small single-room jobs may carry a $200 travel allowance, itemized in your proposal.

Can you handle Emmett's mix of old and new construction?+

Yes — we adjust prep methods for each substrate. Old fir subfloors get plank stabilization; newer OSB gets standard screw-down.

What's the lead time for an Emmett project?+

Typically 4–6 weeks from signed proposal to start, depending on material lead times.

Flooring installation in Emmett

Flooring & tile we install in Emmett, ID.

Same crew, same standards, same fixed-price proposals.

Porcelain & ceramic tile installation
Curbless showers & wet-area waterproofing
Kitchen & bath backsplashes
Solid hardwood install & refinish
Engineered hardwood (wide plank)
Luxury vinyl plank (LVP & SPC)
AC5 laminate flooring
Heated tile floors
Bathroom & kitchen remodels
Remodeling in Emmett

Bathroom & kitchen remodeling in Emmett, Idaho.

Emmett bathroom remodels

Tile showers and wet rooms waterproofed to manufacturer spec, new floor tile, vanities, and fixtures. Fixed-price proposals before demolition starts.

See our bathroom remodeling scope

Emmett kitchen remodels

Backsplash tile, hard-surface flooring run through the main level, cabinet and counter coordination, and clean transitions into adjoining rooms.

See our kitchen remodeling scope

Hard-surface flooring guide

Compare LVP, laminate, engineered and solid hardwood, and porcelain tile on cost, water resistance, and lifespan before you choose for your Emmett home.

Compare flooring materials

Planning a project in Emmett?

We come to you with tile, plank, and finish samples. Same-week consultations available across Gem County.

Book a Consultation
Nearby service areas
All Idaho service areas